
Verified C_TS462_2021 dumps Q&As 100% Pass in First Attempt Guaranteed Updated Dump from TestkingPass
Pass SAP Certified Application Associate C_TS462_2021 Exam With 82 Questions
The SAP C-TS462-2021 exam is designed for individuals who want to validate their expertise in the implementation and configuration of the SAP S/4HANA Sales module. This certification test evaluates candidates' knowledge of critical sales topics related to SAP S/4HANA, including pricing, credit management, order fulfillment, and billing. Candidates who pass this certification exam will receive the SAP Certified Application Associate - SAP S/4HANA Sales 2021 designation.
NEW QUESTION # 25
What are characteristics of Core Data Services (CDS) views? Note: There are 2 correct Answers to this question.
- A. CDS views are fully integrated into the ABAP development environment.
- B. CDS views speed up reporting by providing a dedicated persistency layer.
- C. The analytical engine of embedded BW can be combined with CDS views to provide advanced reporting options.
- D. CDS views replace the analytical engine of embedded BW.
Answer: B,C
NEW QUESTION # 26
How can you manage which materials can be released for a value contract? Note: There are 2 correct answers to this question.
- A. You assign a product hierarchy to the value contract.
- B. You assign an assortment module to the value contract.
- C. You assign a life cycle profile in copying control.
- D. You set up the dependent profitability segment for the value contract.
Answer: C,D
NEW QUESTION # 27
How does the rush order process differ from the standard order process?
- A. A special type of outbound delivery is used.
- B. Shipping output is based on the sales order.
- C. A stock availability check is not performed.
- D. An outbound delivery is created automatically.
Answer: D
NEW QUESTION # 28
What is a characteristic of a service item in a sales order?
- A. The sales price is determined from the service master record.
- B. The service item has no schedule line.
- C. The requested delivery date is set to the current date.
- D. The material of the service item has a specific item category group.
Answer: D
NEW QUESTION # 29
Which of the following are characteristics of an invoice list process? Note: There are 2 correct answers to this question.
- A. You must create an invoice list at specified time intervals or on specific dates.
- B. You must send the payer a single invoice list instead of the individual invoices.
- C. You must set up a periodic billing plan for the invoice list creation.
- D. You use preliminary billing documents for the invoice list creation.
Answer: A,B
NEW QUESTION # 30
You are using multiple address handling in a sales document. At which levels can you configure the address determination? Note: There are 2 correct answers to this question.
- A. Generic partner function
- B. Partner determination procedure
- C. Origin and source of the partner function
- D. Address usage of the business partner
Answer: B,D
NEW QUESTION # 31
You are configuring the organizational structure in your system. Which assignments are possible? Note: There are 3 correct answers to this question.
- A. Assign multiple distribution channels to one company code.
- B. Assign multiple loading points to a plant.
- C. Assign a plant to multiple sales organizations/distribution channels.
- D. Assign multiple plants to one company code.
- E. Assign a shipping point to multiple plants.
Answer: C,D,E
NEW QUESTION # 32
What can you configure in a billing type? Note: There are 2 correct Answers to this question.
- A. Default delivery type for billing
- B. Billing type for cancellation
- C. Reference mandatory indicator
- D. Item number increment
Answer: A,B
NEW QUESTION # 33
How does the system determine the warehouse number in an order-to-cash process?
- A. It is linked to a combination of a shipping point and a loading point.
- B. It is linked to a combination of a plant and a shipping point.
- C. It is linked to a combination of a plant and a storage section.
- D. None
- E. It is linked to a combination of a plant and a storage location.
Answer: E
NEW QUESTION # 34
What are the effects of posting the goods issue during a sales process? Note: There are 3 correct Answers to this question.
- A. The document flow is updated.
- B. The overall status of the delivery is set to complete.
- C. The warehouse task status is set to complete.
- D. The billing document can now be created.
- E. Delivery requirements in material planning are updated.
Answer: A,D,E
NEW QUESTION # 35
Which channels are supported by BRF+ Output Management? Note: There are 3 correct Answers to this question.
- A. ALE
- B. XML
- C. Print
- D. Fax
- E. Email
Answer: B,C,E
NEW QUESTION # 36
Which elements are assigned to field reference groups to influence the status of fields in the material master?
Note: There are 2 correct answers to this question.
- A. Sales organization
- B. Industry sector
- C. Item category group
- D. Plant
Answer: B,D
NEW QUESTION # 37
You investigate the standard behavior of the two sales document types Delivery Free of Charge (FD) and Subsequent Delivery Free of Charge (SD). What do you find out? Note: There are 2 correct answers to this question.
- A. A Subsequent Delivery Free of Charge has to be created with reference to a preceding document.
- B. A Delivery Free of Charge is used to deliver material due to a complaint.
- C. In both cases, materials are priced and billed normally but the shipping is free of charge.
- D. Documents of both document types can use the same item category.
Answer: A,D
NEW QUESTION # 38
Which of the following is a characteristic of a service item in a sales order?
- A. The Delivering Plant field is not required.
- B. The item in the sales order is blocked for delivery.
- C. The material has a specific item category group.
- D. The service item has no schedule line assigned.
Answer: C
NEW QUESTION # 39
The delivering plant should be determined automatically for a sales order item. Which master data sources can be used to achieve this? Note: There are 3 correct Answers to this question.
- A. Material determination
- B. Ship-to party
- C. Customer material info record
- D. Material listing
- E. Material master
Answer: B,C,E
NEW QUESTION # 40
During the material availability check for a sales order item, the ordered quantity is completely confirmed on the required date even though there is only a partial quantity in stock. Which setting could lead to this behavior?
- A. The Complete Delivery indicator is set in the business partner master record and in the customer material info record.
- B. The With Reservations indicator is set in the configuration of the scope of availability check.
- C. The Maximum Number of Partial Deliveries indicator is set to 1 in the sales order item.
- D. The Without Replenishment Lead Time indicator is not set in the configuration of the scope of availability check.
Answer: D
NEW QUESTION # 41
......
Ultimate Guide to Prepare Free C_TS462_2021 Exam Questions and Answer: https://drive.google.com/open?id=1gDg3cg6KLaUseEUMk-ceqGwYQPZ8_F_D
Pass C_TS462_2021 Tests Engine pdf - All Free Dumps: https://www.testkingpass.com/C_TS462_2021-testking-dumps.html