NEW QUESTION # 35
As part of maintaining (importing new employees that were added last week) project enterprise labor resources in your organization, you submit the Maintain Project Enterprise Labor Resources process to create and update resources based on changes in HCM. You define maintenance conditions on the Manage Project Enterprise Labor Resource page to process both employees and contingent workers. (Choose the best answer.)

  • A. Pool Membership
  • B. attributes that the project enterprise resources are assigned after creation
  • C. Person Type
  • D. Jobs

Answer: C

Explanation:
Reference https://docs.oracle.com/cloud/farel8/projectcs_gs/OAPEX/F1082603AN23E61.htm Manage Project Enterprise Labor Resource Maintenance Conditions Project Enterprise Labor Resources: How They Are Automatically Created and Maintained Run the Maintain Project Enterprise Labor Resources process to create resources, remove resource availability for staffing, and maintain the resource search index.
Settings That Affect the Maintain Project Enterprise Labor Resources Process Create and maintain project enterprise labor resources by defining a set of conditions that specify the employees and contingent workers in Oracle Fusion Human Capital Management (HCM) to create as resources in Oracle Fusion Project Portfolio Management. Define the resource attribute values, such as the resource calendar and primary project role, to assign to the new resources.
The following table lists the criteria that you define for selecting HCM persons to create as project enterprise labor resources.
Selection Criteria
Description
Person type
Select the HCM person type for the process to use as criteria when selecting HCM persons to create as resources. Available person types are employees, contingent workers, or both employees and contingent workers.
Option to select people based on job
Select this option for the process to create resources for HCM persons with specific jobs.
Caution If you do not select job criteria for this condition, the process will create resources for all eligible people based only on the person type.
Jobs
If you selected the option to select people based on job, then select the jobs for the process to use as HCM person selection criteria.
The following table lists the attributes for which you specify values to assign to resources that are created for the condition.
Resource Attribute
Description
Option to manage resource availability and staffing
Select this option for resource managers to manage the availability and project staffing of resources who are created based on the condition. Resources who are managed in Oracle Fusion Project Resource Management are eligible to fulfill project resource requests.
Calendar
Select the resource calendar for resources that are created based on the condition. The resource calendar defines the work schedule for project enterprise labor resources, and includes working days and hours and any exceptions, such as holidays.
Primary project role
Select the primary project role for resources that are created based on the condition. Project roles are maintained in Oracle Fusion Project Management.
Cost rate and currency
Enter the cost rate and currency for resources that are created based on the condition.
Bill rate and currency
Enter the bill rate and currency for resources that are created based on the condition.


NEW QUESTION # 36
Your organization has been awarded a new contract based on which you are allowed to sell:
Items not tracked in inventory
Inventory items
Services
Which contract structure would fulfill your requirement of item sales? (Choose the best answer.)

  • A. Create two contract lines with a line type each of "sell intent, free-form, project-based" and "sell intent, item, project-based".
  • B. Create two contract lines with a line type each of "free-form, project-based buy agreement" and "bundle sell, project-based".
  • C. Create two contract lines with a line type each of "product, project-based, sell agreement, standalone" and "sell intent, item, project-based".
  • D. Create two contract lines with a line type each of "sell intent, item, project-based' and "subscription, project-based, sell".

Answer: D

Explanation:
To sell items not tracked in inventory, inventory items, and services, you can create two contract lines with different line types. The line type of "sell intent, free-form, project-based" allows you to sell any item or service without specifying the item number or quantity. The line type of "sell intent, item, project-based" allows you to sell inventory items by specifying the item number and quantity. Both line types are project-based, meaning they are linked to a project and generate revenue based on project performance. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-contracts.html#OAPFM2355835


NEW QUESTION # 37
You want to export your project plan to Oracle Project Financial Management Cloud after initial scheduling is complete in Microsoft Projects.
Identify three conditions that must be met for exporting milestone tasks.
(Choose three.)
Response:

  • A. lowest-level tasks set up with zero duration
  • B. only one labor resource assignment with 100 effort
  • C. percent work complete values of 0 or 100 percent
  • D. lowest-level tasks set up with non-zero duration
  • E. only one labor resource assignment with 0 effort

Answer: B,C,E


NEW QUESTION # 38
Which setup option is common to both financial and project plan types?

  • A. Enable the use of a workflow for managing budget or forecasting status changes.
  • B. Enable the entry of plan amounts in currencies other than the project currency.
  • C. Identify whether the plan type is the default selection when you create budget or forecast versions.
  • D. Manage the options for creating control budgets in Oracle Fusion Budgetary Control.

Answer: B

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-control-configuration-manage-financial-and-project-plan-types.html#OAPFM75315 Financial and Project Plan Setup Options The following table describes the basic budget, forecast, or project plan setup options that determine how a plan type is used in the context of a project. Except for third-party scheduling, you can,t edit these options at the project level.
Option
Location
Description
Planning amounts
Financial plan type
Indicates that the financial plan type supports the creation of versions with the following amounts:
Cost amounts
Revenue amounts
Both cost and revenue amounts
Either cost or revenue amounts
Approved budget or primary forecast
Financial plan type
Determines whether a financial plan type is used for creating approved budget versions or primary forecast versions that are used for plan comparison or project performance reporting.
Default financial plan type
Financial plan type
Determines whether the financial plan type is the default selection when you create budget or forecast versions.
Workflows
Financial plan type
Enables the use of a workflow for managing budget or forecast status changes.
Third-party scheduling software
Project plan type
Indicates whether project planning is performed in Microsoft Project.
If third-party scheduling is disabled in the project plan type, you can use the associated project or project template to create a project in Microsoft Project. However, you can,t export the new project or link it to one created in Oracle Fusion Project Portfolio Management.
Multiple transaction currencies
Financial and project plan type
Enables entry of plan amounts in currencies other than the project currency.
Budgetary control settings
Financial plan type
Manages options for creating control budgets in Oracle Fusion Budgetary Control.


NEW QUESTION # 39
Your customer has separate organizations to maintain indirect, capital, and billing types of projects.
Identify the two setups that can be used to fulfill this requirement.

  • A. Project Organization Classification
  • B. Project Accounting Business Function
  • C. Organization Tree
  • D. Project Type
  • E. Business Unit

Answer: A

Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/FAPFM/FAPFM1225328.htm


NEW QUESTION # 40
Your organization has been using project class categories and codes for reporting purposes and is set up at the project level. You recently defined a new project type, Capital-Contract, and created new class categories named Build, Operate, and Transfer (BOT) and Build, Transfer, and Maintain (BTM), with class codes of Yes/No. But on creation of a project, you are unable to associate these class categories and codes.
Identify two setups that are mandatory for these class categories and codes to be displayed.

  • A. Class categories should be assigned to business unit.
  • B. Class codes should be assigned to project unit.
  • C. Class codes should be associated with a related set code.
  • D. Class categories should be assigned to project type.

Answer: B

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapfm/project-foundation-configuration-manage-project-types.html#OAPFM360164 Topic - Associating Project Types and Class Categories: Examples Project classifications group your projects according to categories and codes that you define. When you associate project classifications with project types, the classification is available for selection on projects with that project type.
Use any of the following methods to associate class categories with project types:
Add a classification to the project type definition
For each classification that you associate with the project type, you can enable the Assign to All Projects option to automatically add the classification to the project definition for all new projects with the project type. When this option is enabled, all projects with this project type must be assigned a class code for the class category.
Add a project type to the class category definition
Enable the Assign to all Project Types option on the class category definition


NEW QUESTION # 41
You configure one OTBI using Project Cross Subject Area Analysis Real Time. You notice that all measures (Budget, Forecast, Cost, Commitments, Revenue, and Invoice) are not available for Bill-To-Customer and Contract and Contract Line dimensions. Identify the reason for this behavior. (Choose the best answer.)

  • A. The Bill-To-Customer dimension does not apply to Invoice measures, but the Contract and Contract Line dimensions apply only to Revenue and Invoice measures.
  • B. The Contract and Contract Line dimensions apply only to Invoice measures.
  • C. The Bill-To-Customer dimension applies only to Invoice measures, but the Contract and Contract Line dimensions do not apply to Revenue and Invoice measures.
  • D. The Bill-To-Customer dimension applies only to Revenue and Invoice measures.
  • E. The Bill-To-Customer dimension applies to Invoice measures, and the Contract and Contract Line dimensions apply to Revenue and Invoice measures.

Answer: A

Explanation:
Ref:https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/faopm/subjectareas.html#Projects__Cross_Subject_Area_Analysis__Real_Time_SA_20 Analyze real-time information on project performance, including budgets, forecasts, costs, commitments, revenue, and invoices.
This subject area analysis allows cross subject area analysis between Funding, Invoices, Revenue, Budget, forecasts, Costs areas.


NEW QUESTION # 42
You are now the project manager of a newly created implementation project. Which two items are not part of managing an implementation project?

  • A. Enable optional functional areas and features by opting in.
  • B. Monitor the progress of completing setup tasks.
  • C. Generate a list of setup tasks.
  • D. Assign tasks to various users who are responsible for managing setup data.
  • E. Select the offering you want to implement.

Answer: B

Explanation:
Selecting the offering you want to implement and enabling optional functional areas and features by opting in are not part of managing an implementation project. These are part of configuring an implementation project, which is done before managing an implementation project. Configuring an implementation project allows you to define the scope and features of your implementation based on your business needs. Managing an implementation project involves assigning tasks to various users who are responsible for managing setup data, monitoring the progress of completing setup tasks, and generating a list of setup tasks. These are part of executing an implementation project, which is done after configuring an implementation project. Executing an implementation project allows you to perform the setup tasks and validate the setup data for your implementation. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/implement-project-financial-management-applications.html#OAPFM2356021


NEW QUESTION # 43
Identify two attributes for which you can enter budgets that will be considered for Budgetary Controls in Project Portfolio Management.

  • A. resource
  • B. project plan type
  • C. expenditure item
  • D. project classification
  • E. project

Answer: E

Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPJF/OAPJF1121937.htm#OAPJF1121937


NEW QUESTION # 44
Your customer started operations and all projects in January 2015. They implemented Enterprise Project Structure for calculating project labor demand by using the Annual option. When they view the labor demand on 15-Dec-2015, the project hierarchy viewer shows data only for the year 2015. The client expected the demand to be shown for a year, from 15-Dec-2015 to 15-Dec-2016.
Identify how the project hierarchy viewer displays labor demand information. (Choose the best answer.)

  • A. The project start date of Jan-2015 was used for calculating labor demand, and hence it calculated the demand for the year 2015.
  • B. The date entered by a user as a parameter when running the Update EPS job was set to 01-Jan-2015, and hence the calculations show results for the year 2015.
  • C. The current date is used for calculating labor demand for the current year.
  • D. The current period start date is used for calculating labor demand for the current year.

Answer: C

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapem/analyze-project-management-performance.html#OAPEM1313471 Topic - Project Labor Demand: How It,s Calculated Settings That Affect Project Labor Demand Project application administrators must do the following to set up how project labor demand is calculated:
Organize projects into hierarchical groups on the Manage Enterprise Project Structure page.
Change the quarterly FTE hours for the organization on the Define Project Management Implementation Options page, if different from 520 hours.
Note: You can choose to view labor demand annually instead of quarterly. The Project Hierarchy Viewer uses the current date to determine which year or quarter to display.


NEW QUESTION # 45
Identify the attribute of a project type that determines if expenditure items are billable, and the amount type to be used as the basis for transfer pricing. (Choose the best answer.)

  • A. work type
  • B. cost type
  • C. event type
  • D. expenditure type

Answer: C

Explanation:
Reference https://docs.oracle.com/cloud/latest/projectcs_gs/OAPFM/OAPFM1125361.htm#OAPFM1125277 (what's a work type?) In billing, you can use work types to classify work for the following purposes:
To determine the default billable status of expenditure items.
To classify cross-charge amounts into cost and revenue for cross-charge transactions.
Tip: To use work types to determine whether an expenditure item is billable you must set the profile option Work Type Derived for Expenditure Item to Yes.
When you create or import expenditure items, the default work type is inherited from the associated task. Tasks, in turn, inherit work type values from parent tasks and ultimately from the project. Project types determine the default work type value for projects and project templates.


NEW QUESTION # 46
Which three tasks can be performed using the project requirements work area? (Choose three.)

  • A. adding scrum master to backlog items.
  • B. creating issues for the backlog items.
  • C. creating change orders for the backlog items.
  • D. creating projects and tasks in the context of backlog items.
  • E. tracking backlog item status from the requirement storyboard.

Answer: D

Explanation:
The project requirements work area is a work area that allows you to define and manage requirements for your projects using various methods and sources. Requirements are statements of needs or expectations that must be met by the project outcome. Backlog items are a type of requirement that are used for agile projects that follow an iterative and incremental approach. Three of the tasks that can be performed using the project requirements work area are:
creating projects and tasks in the context of backlog items: This task allows you to create new projects and tasks or link existing projects and tasks to backlog items. This helps you to plan and execute the work that is required to fulfill the backlog items.
creating issues for the backlog items: This task allows you to create new issues or link existing issues to backlog items. Issues are problems or risks that affect the progress or outcome of a project or requirement. This helps you to track and resolve the issues that are related to the backlog items.
tracking backlog item status from the requirement storyboard: This task allows you to view and update the status of backlog items from the requirement storyboard. The requirement storyboard is a graphical representation of the progress and completion of backlog items using various stages and lanes. This helps you to monitor and control the delivery of backlog items. Adding scrum master to backlog items and creating change orders for the backlog items are not tasks that can be performed using the project requirements work area. Adding scrum master to backlog items is a task that can be performed using the project team work area, as scrum master is a role that is assigned to a project team member who facilitates and coordinates the agile project activities. Creating change orders for the backlog items is a task that can be performed using the project change management work area, as change orders are documents that capture and approve changes to a project scope, schedule, or budget. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-project-execution.html#OAPFM2356321


NEW QUESTION # 47
Your organization has created an Enterprise Project Structure (EPS) and your executives review the overall project labor demand by using the EPS. Identify two correct statements about the periodic project labor demand.

  • A. Labor Demand FTE is calculated as Monthly Allocation hours divided by Monthly FTE hours, if a period is used as the basis for viewing labor demand.
  • B. Labor Demand FTE is calculated as Project Allocation hours divided by Project FTE hours, if project duration is used as the basis for viewing labor demand.
  • C. Labor Demand FTE is calculated as Yearly Allocation hours divided by Yearly FTE hours, if a year is used as the basis for viewing labor demand.
  • D. Labor Demand FTE is calculated as Quarterly Allocation hours divided by Quarterly FTE hours, if a quarter is used as the basis for viewing labor demand.

Answer: D

Explanation:
Reference https://docs.oracle.com/cloud/farel10/projectcs_gs/OAPEM/OAPEM1461017.htm#OAPEM1313472 Project Labor Demand: How It,s Calculated Project executives want to track the labor demand in projects in their organization. The Project Hierarchy Viewer provides project executives a hierarchical view of the enterprise project structure (EPS) along with the labor demand in terms of full-time equivalent (FTE).
Settings That Affect Project Labor Demand
Project application administrators must do the following to set up how project labor demand is calculated:
Organize projects into hierarchical groups on the Manage Enterprise Project Structure page.
Change the quarterly FTE hours for the organization on the Define Project Management Implementation Options page, if different from 520 hours.
Note: You can choose to view labor demand annually instead of quarterly. The Project Hierarchy Viewer uses the current date to determine which year or quarter to display.
How Project Labor Demand Is Calculated
The Project Hierarchy Viewer calculates project labor demand in the following manner:
Spreads the allocation hours from the Manage Project Resources page evenly over the days that the resources are allocated to the project.
Divides the quarterly project allocation hours by the quarterly FTE hours to get the labor demand.
Rolls up the quarterly and annual labor demand up the hierarchy.


NEW QUESTION # 48
You create a contract with two contract lines: Line 1 and Line 2. You create separate bill plans: A for contract Line 1 and B contract for Line 2, with a different bill set number (11 for Bill Plan A and 22 for Bill Plan B).
Then Bill Plan A is allocated against Project X - Task 10, and Bill Plan B is allocated against Project Y - Task 30.
Based on the preceding setup, you are generating invoices. Identify two correct statements about invoice generation in this scenario.

  • A. Invoice generation does not depend on bill plan. The invoices are created based on the contract line.
  • B. Bill set number drives the grouping of transactions.
  • C. Both the contract lines create only a single invoice because they are using the same contract.
  • D. Two invoices are created using the same contract.

Answer: C

Explanation:
Ref: https://docs.oracle.com/cd/E51367_01/projectop_gs/OAPJB/F1087456AN1006D.htm What,s a bill set?
Transactions originating from different bill plans with the same bill set number on a contract are included on the same invoice. If a contract has multiple bill plans and each have different values for the bill set, Oracle Fusion Project Billing creates a separate invoice for each bill plan


NEW QUESTION # 49
Which two privileges are assigned to the Project Plan Management duty in Security Reference Implementation?

  • A. Allocate Project Expense
  • B. View Project Progress
  • C. Transfer Project
  • D. Manage Project Plan Resource Assignment

Answer: D

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19a/oapjm/index.html#_Toc468200732_1_12 Topic - Privileges - This table lists privileges granted to duties of the abstract role Project Management Duty.
Granted Role - Project Plan Management
Privilege - only A and C are listed


NEW QUESTION # 50
Shift is one of the key elements in defining project and resource calendars.
Which two additional key elements are required to define the project and resource calendars?

  • A. Expenditure Type
  • B. Workday Patterns
  • C. Schedule Exceptions
  • D. Time off
  • E. Accounting Calendar

Answer: C

Explanation:
Shift is one of the key elements in defining project and resource calendars. Two additional key elements that are required to define the project and resource calendars are:
Schedule Exceptions: These are dates or periods that override the regular workday patterns and shifts of a calendar. They can be used to define holidays, vacations, or other special events that affect the availability of resources or projects.
Workday Patterns: These are patterns of working and nonworking days that repeat over a period of time. They can be used to define the standard working days and hours for a calendar. Time off, expenditure type, and accounting calendar are not key elements in defining project and resource calendars. Time off is an attribute of a resource assignment that reduces the availability of a resource. Expenditure type is a classification of costs that determines how they are processed and accounted. Accounting calendar is a calendar that defines the accounting periods and dates for transactions. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/manage-project-resources.html#OAPFM2356131


NEW QUESTION # 51
You are implementing Project Portfolio Management for a global professional services organization. In their Consulting Services line of business, it is common to use resources from different business units based on the skills required. Therefore, cross-charge transactions happen between business units within the same legal entity. Transfer price calculations need to be based on raw costs, with no further adjustments to transfer price.
Identify two setups that can drive this borrowed and lent agreement.

  • A. Transfer price basis must be Raw Cost and calculation method must be Rate Schedule.
  • B. A document entry such as straight time must be enabled for cross-charge transactions.
  • C. Transfer price basis must be Burdened Cost, and calculation method must be Burden Rate Schedule.
  • D. Transfer price basis must be Raw Cost and calculation method must be Basis Only.

Answer: D

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapfm/project-billing-configuration-define-transfer-pricing.html#OAPFM3094619


NEW QUESTION # 52
As you go through the first-quarter close for your customer, you notice that the burden amounts calculated do not seem to be right. Based on the calculations, you notice that the amounts calculated are not considering the burden schedule override at a task level, which was done during the second month of the quarter.
What is the reason for this problem?

  • A. Only new expenditure items charged to the task use the new burden schedule; expenditure items processed earlier can be manually marked for reprocessing.
  • B. All expenditure items charged to the task use the new burden schedule.
  • C. You can enable automatic reprocessing of expenditure items processed before the burden schedule change.
  • D. Only new expenditure items charged to the task use the new burden schedule; expenditure items processed earlier cannot be reprocessed.

Answer: B

Explanation:
Reference https://docs.oracle.com/cloud/r13_update17b/projectcs_gs/OAPJC/OAPJC1071490.htm#OAPJC1071482


NEW QUESTION # 53
You are managing a project based on a Waterfall model. You define a project and a project plan in Oracle Project Portfolio Management with tasks and subtasks applicable to each of the phases of the project: Initiation, Discovery, Design, Build, Test, and Deploy. As a project manager, you want to define deliverables for your project requirements that are elucidated during the Discovery phase of your project. You now want to understand how the inheritance between requirements, tasks, and deliverables works. Identify the two correct statements in this respect.

  • A. A deliverable associated with a requirement is automatically associated with the tasks created for that requirement.
  • B. A deliverable associated with a requirement is not automatically associated with the tasks created for that requirement.
  • C. The association of a deliverable with a task is dependent on associating a requirement with a task.
  • D. You associate a deliverable with a task, independent of associating a requirement with a task.

Answer: B

Explanation:
Ref: https://docs.oracle.com/en/cloud/saas/project-portfolio-management/19b/oapem/define-project-deliverables.html#OAPEM1122079 Associate deliverables with one or many tasks or requirements at any level. Associate existing deliverables to tasks or requirements or create deliverables directly for tasks or requirements. You can delete a deliverable in New status if it is not associated with tasks or requirements.
Can deliverables for projects and tasks be inherited from associated requirements?
No. A deliverable associated with a requirement is not automatically associated with the tasks created for that requirement.
You associate a deliverable with a task, independent of associating a requirement with a task.


NEW QUESTION # 54
Which product offering enables you to collaboratively plan and deliver projects by leveraging intuitive and integrated scheduling tools?

  • A. Project Costing
  • B. Resource Management
  • C. Project Control
  • D. Project Management

Answer: D

Explanation:
Project Management is the product offering that enables you to collaboratively plan and deliver projects by leveraging intuitive and integrated scheduling tools. Project Management allows you to create and manage project plans, tasks, deliverables, issues, milestones, gates, etc. using various methods and sources. You can also monitor and control project progress and performance using dashboards and reports. Resource Management is the product offering that enables you to optimize the utilization and allocation of resources for projects and tasks. Resource Management allows you to create and manage resource requests, assignments, pools, calendars, etc. using various criteria and sources. You can also monitor and analyze resource availability and demand using dashboards and reports. Project Control is the product offering that enables you to simplify the planning, budgeting, and forecasting capabilities for projects and tasks. Project Control allows you to create and manage project budgets, forecasts, financial plans, etc. using various methods and sources. You can also monitor and control project costs and variances using dashboards and reports. Project Costing is the product offering that enables you to capture and process project costs from various sources and applications. Project Costing allows you to create and manage project transactions, expenditures, assets, etc. using various rules and options. You can also generate project costing and accounting entries using dashboards and reports. https://docs.oracle.com/en/cloud/saas/project-portfolio-management/20c/oapfm/overview-project-financial-management.html#OAPFM2356301


NEW QUESTION # 55
......