SAP C_TS422_2020 certification is intended for professionals involved in the implementation, configuration, and maintenance of SAP S/4HANA Production Planning and Manufacturing. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing certification exam is ideal for individuals who are seeking to validate their knowledge and skills in this field and demonstrate their proficiency in using SAP S/4HANA to manage production planning and manufacturing processes. Passing the SAP C_TS422_2020 certification exam can help individuals enhance their career prospects and open up new opportunities in the field of SAP S/4HANA Production Planning and Manufacturing.
NEW QUESTION # 41
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Consumption-based planning
- B. Material requirements planning
- C. Forecast planning
- D. Manual planning without check
Answer: A
NEW QUESTION # 42
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP creates capacity requirements only if the work center has sufficient capacity.
- D. MRP creates capacity requirements without checking the capacity of a work center.
Answer: D
NEW QUESTION # 43
When do you use variant bills of materials (BOMs)?
- A. When multiple master also have the same BOM
- B. When multiple master also have similar BOMs
- C. When a material has a configurable BOM
- D. When a material has multiple BOMs
Answer: A
NEW QUESTION # 44
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Validity period or sales order
- B. Alphanumeric or quota arrangement
- C. Lot size or material cost
- D. Planned order or materialnumber
Answer: B
NEW QUESTION # 45
In which data objects do you maintain the production in as the work center for repetitive manufacturing?
There are 2 correct answers to this question.
- A. Production version
- B. Repetitive manufacturing profile
- C. Production cost collector
- D. Routing
Answer: A,D
NEW QUESTION # 46
What are the key aspects of SAP S/4HANA? There are 2 correct answers to this question.
- A. SAP S/4HANA increases the data footprint.
- B. SAP S/4HANA has minor changes on data model.
- C. SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both.
- D. SAP S/4HANA is built on SAP HANA
Answer: C,D
NEW QUESTION # 47
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?
- A. Specify a negative offset time in the strategy profile.
- B. Specify a negative planning horizon in the strategy profile.
- C. Specify a positive offset time in the strategy profile.
- D. Specify a positive planning horizon in the strategy profile.
Answer: A
NEW QUESTION # 48
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question.
- A. Scheduling margin key
- B. Production scheduling profile
- C. Confirmation profile
- D. Operation control key
Answer: B,D
NEW QUESTION # 49
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Functional Location BOM
- B. Work Center BOM
- C. Class BOM
- D. Sales Order BOM
Answer: A,D
NEW QUESTION # 50
What are some of the advantages of using Kanban? There are 2 correct answers to this question.
- A. Replenishments are based on centralized planning
- B. It is a simplified form of production control
- C. It is mostly accomplished by manual postings
- D. Replenishments are created close to the actual need
Answer: B,D
NEW QUESTION # 51
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question.
- A. MRP Live can priorities demand from sales orders
- B. MRP Live can propose alternative solutions
- C. MRP Live can plan materials with recursive BOMs
- D. MRP Live can create production orders automatically
Answer: B,D
NEW QUESTION # 52
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named "W1904_1000_001". What does the suffix 001 in the resource name represent?
- A. Capacity category
- B. Number of individual capacities
- C. Available capacity version
- D. Work center category
Answer: A
NEW QUESTION # 53
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A. Material staging for next order in sequence
- B. Posting of goods receipt for the product
- C. Archiving of documents for assembly scrap
- D. Posting of production costs to the production cost collector
- E. Reduction of associated capacity requirements
Answer: B,D,E
NEW QUESTION # 54
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer.
- A. Plant Settings -> MRP Group -> Material Master
- B. MRP Group -> Material Master -> Plant Settings
- C. Material Master -> MRP Group -> Plant Settings
- D. Material Master -> Plant Settings -> MRP Group
Answer: C
NEW QUESTION # 55
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The lot size range must be within the lot-size range of the assigned routing.
- B. The assigned routing must NOT have alternative sequences.
- C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- D. The assigned routing must be a rate routing.
- E. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
Answer: A,C,E
NEW QUESTION # 56
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.
- A. In Customizing you can decide by material type whether to use the long material number.
- B. The display template for material numbers applies to all clients.
- C. The number of leading zeros for internal numbers is client-specific.
- D. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
Answer: B,D
NEW QUESTION # 57
......