NEW QUESTION 34
Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version.

  • A. Add an Operation
  • B. Costing Priority
  • C. Delete an Operation
  • D. Completion Subinventory
  • E. Production Priority

Answer: A,D,E

 

NEW QUESTION 35
You are setting up Fusion Manufacturing to support Back-to-Back Fulfillment.
Identify an option that needs to be set for oracle Fusion Planning Central to plan back-to-back item components and resources.

  • A. Select the Used in Planning check box in the new Work Definition.
  • B. Select the Used in Planning check box in the item definition.
  • C. Select the Used in Planning check box in the Work Structure.
  • D. Select the Used in Planning check box in the Work Definition Names.

Answer: D

 

NEW QUESTION 36
In a manufacturing cloud implementation, production operators want to perform work order updates using Dispatch List.
Identify two tasks that the Dispatch List allows the production users to perform.

  • A. Report Material Transactions by Quantity and Serial Number
  • B. Report Receipts
  • C. Report Cost Transactions
  • D. Report Resource Transactions
  • E. Report Component Returns

Answer: A,D

 

NEW QUESTION 37
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.

  • A. Rescheduled Work Order WO-2045 duration = 3.25days
  • B. Rescheduled Work Order WO-2045 duration = 1.25 days
  • C. Rescheduled Work Order WO-2045 duration = 0.75 days
  • D. Rescheduled Work Order WO-2045 duration = 2 days

Answer: C

 

NEW QUESTION 38
In your customer's manufacturing facility, different types of Movement Requests are created. Key manufacturing components are issued to the work orders form the manufacturing subinventory. The manufacturing subinventory receives its supplies form the Warehouse subinventory through automatically created Movement Requests.
Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse subinventory?

  • A. Batch Wave Movement Requests
  • B. Requisition Movement Requests
  • C. Replenishment Requests
  • D. Pick Wave Movement Requests

Answer: B

 

NEW QUESTION 39
In what three ways can you set the overcompletion tolerance for a subcomponent yield, so the job order can report the excess production completion?

  • A. Overcompletion Tolerance Type = Percentage, value > 0
  • B. Overcompletion Tolerance Type = Amount, value > 0
  • C. Overcompletion Tolerance Type = Amount, value = 0
  • D. Overcompletion Tolerance Type = Percentage, value = 0
  • E. Overcompletion Tolerance Type = Percentage, value = 100

Answer: A,C,D

 

NEW QUESTION 40
Which entity should you use to configure the manufacturing plant in Functional Manager?

  • A. Plant
  • B. Organization
  • C. Business Unit
  • D. Legal Entity

Answer: A

 

NEW QUESTION 41
Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

  • A. Version
  • B. Costing Priority
  • C. State Date
  • D. Production Priority

Answer: A,C

 

NEW QUESTION 42
The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.

  • A. The item was made inactive after the Work Order transaction.
  • B. The Costing Interfaced Attribute is not enabled in the resource definition.
  • C. The Costing Interfaced Attribute is enabled in the resource definition.
  • D. The Manage Item Rules setup is not complete.

Answer: B

 

NEW QUESTION 43
Your customer is a light assembly manufacturing company that doesn't require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must be completed and verified in the Work Definition area?

  • A. Ensure there is only one default standard operation at a given point in time.
  • B. Select a resource that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
  • C. Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
  • D. Ensure the item is a standard item with a secondary item structure.
  • E. Ensure the predefined work definition name ORA_MAIN name is active.

Answer: C,D,E

 

NEW QUESTION 44
Your customer has completed the required setup steps for automatic work definition. Identify the option that shows the navigation steps needed to create an automatic work definition.

  • A. Manufacturing > Work Definition> Manage Standard Operations> Create automatic definition
  • B. Manufacturing> Work Definition> Manage Standard Operations> Select default standard operation> Actions> Create automatic work definition
  • C. Product Management> Product Information Management> Items> Edit Item > Actions> Create automatic work definition
  • D. Manufacturing > Work Definition> Manage Work Definitions> Actions> Create automatic work definition

Answer: B

 

NEW QUESTION 45
As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?

  • A. The Manufacturing Master Data Functional Area
  • B. The Manage Items Profile Options tasks
  • C. The Manage product and Child Value Sets task
  • D. The Supply Chain Orchestration Functional Area

Answer: A

 

NEW QUESTION 46
An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by in-house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated creation of a Supply Order rather than Work Order.
Identify two options that can cause this situation.

  • A. Sourcing rules for the product item are defined as Make as well as Transfer.
  • B. Sourcing rules for the product item are defined as Buy as well as Transfer.
  • C. Sourcing rule for the product item is defined as Buy.
  • D. Sourcing rule for the product item is defined as Make, but Work Definition is not defined.

Answer: A,D

 

NEW QUESTION 47
In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required.
A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting.
Identify three process steps that the cost accountant has to perform to transfer the assembly to cost accounting in frozen type.

  • A. Publish cost planning scenario to Accounting.
  • B. Build cost planning scenario and perform cost roll up.
  • C. Transfer transactions from production to Costing.
  • D. Create Accounting Distributions.
  • E. Transfer Transactions from Inventory to Costing.
  • F. Define a cost planning scenario with Material, Resource, Overhead cost plans, and work definition.

Answer: D,E,F

 

NEW QUESTION 48
Your customer has the following business requirement. There are two work definitions created in the application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Goods as one of its component.
Identify the way to establish the relationship between Pallet and Engine Work Definitions.

  • A. Create a Subinventory that could be the completion Subinventory for yielding the pallet and then the same Subinventory can serve as the supply Subinventory of the pallet in the Work Definition created for Engine.
  • B. The two Work Definitions can be tied through Project or Seiban numbers.
  • C. The Work Definition versions can be used to tie the Work Orders.
  • D. Assign a higher priority to the Work Definition created for Engine and a lower one for the Work Definition for Pallet.

Answer: C

 

NEW QUESTION 49
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for that week.

  • A. 78 hours
  • B. 70 hours
  • C. 76 hours
  • D. 60 hours

Answer: A

 

NEW QUESTION 50
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product.
Which seeded job role must this employee be provided with?

  • A. Production Operator
  • B. Manufacturing Engineer
  • C. Production Engineer
  • D. Manufacturing Supervisor
  • E. Production Supervisor

Answer: B

 

NEW QUESTION 51
A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

  • A. Report Resource, Material and Operation Transactions
  • B. Review Production Transaction History
  • C. Review Dispatch List
  • D. Manage Work Orders

Answer: D

 

NEW QUESTION 52
The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such a way that those are costed to the work order for which operations are performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.

  • A. Set up the machines as cost element type of "Overhead" by selecting Cost Element set Common.
  • B. Set up the machines as cost element type of "Overhead" by selecting Cost Element set ABC.
  • C. Set up the machines as cost element type of "Resource" by selecting Cost Element set Common.
  • D. Set up the machines as cost element type of "Resource" by selecting Cost Element set ABC.

Answer: C

 

NEW QUESTION 53
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.

  • A. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).
  • B. Set the global sourcing rule in GOP to determine supply creation option as Make.
  • C. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.
  • D. Set a local sourcing rule in GOP to determine supply creation option as Make.
  • E. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.

Answer: A,B

 

NEW QUESTION 54
A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.

  • A. Reverse the product at the last operation.
  • B. Reverse at an operation.
  • C. Reverse material issued to a work order.
  • D. Reverse from reject to ready.
  • E. Reverse resources charged to a work order.
  • F. Reverse from scrap to ready.

Answer: C,D,E,F

 

NEW QUESTION 55
While creating an item in Product Information Management (PIM), the following two item templates are selected in sequence and applied.
1. Template: Finished Goods (WIP = No, Customer Ordered = Yes)
2. Template: Sub-assembly (WIP = Yes, Customer Ordered = No)
Identify the Item Attribute values in the application.

  • A. WIP = Yes, Customer Ordered = Yes
  • B. WIP = Yes, Customer Ordered = No
  • C. WIP = No, Customer Ordered = No
  • D. WIP = No, Customer Ordered = Yes

Answer: D

 